Green Valley Ranch Canal Improvement Zone

Exciting updates coming soon!

The Conservancy partnered closely with Green Valley Ranch neighbors to design activation and amenity improvements between miles 65 and 68 of the High Line Canal. Designs include an outdoor classroom with a shade structure, irrigated tree planting, a single-track trail with easy-level skills features and an outdoor fitness area. These community-centered designs will be completed in 2026. 

Project Areas

Marrama Park

Marrama Park will gain new irrigated trees and a shaded outdoor classroom to support students from Marrama Elementary and provide a community gathering space.

Ensenada Park

Enseda Park will see a new singletrack trail added adjacent to the High Line Canal for bike users to explore. 

Green Valley Ranch East Park

Green Valley Ranch East Park is gaining a fitness area designed to provide a full-body workout, a singletrack trail and new interpretive signage with a focus on history. 

Project FAQs

The Conservancy led the public outreach, design, and construction phases. The City and County of Denver were included in the design review and construction administration. 

A Great Outdoors Colorado (GOCO) grant is funding all project areas with support from the Great Lengths Campaign. 

The Improvement Zone includes three specific sites between N. Argonne St. and Lisbon St.: Marrama Park, Ensenada Park, and Green Valley Ranch East Park. 

These improvements were identified during the outreach of The Plan for the High Line. Since then, the Conservancy conducted additional community outreach and jurisdictional coordination regarding specific aspects in each location of the improvement zone.

An outdoor classroom will be added between the Conservancy–planted pollinator garden and Marrama Park that includes interpretive signage and a shade structure. Irrigated tree planting will increase shade along the HLC Trail from Marrama Park to N Ensenada St. North of Ensenada Park, a singletrack trail is being added adjacent to the HLC Trail. South of Green Valley Ranch East Park, there will be an additional singletrack trail, interpretive signage and functionally linked outdoor fitness equipment.   

Each improvement area will vary in construction duration. We anticipate all projects within the improvement zone to be completed 10-11 months from groundbreaking.  

Minimal trail disruption is expected, and flaggers will redirect trail traffic as needed. Detours may occur during specific construction phases and will be signed as needed. 

The City will safeguard trees needing protection by following its standard procedures and coordinating with a City forester.